
We install some of the most important and complex systems in a building. Yet these systems are seldom seen, hidden beneath floors, behind walls and above ceilings. It is therefore essential to install them correctly the first time. Done once is done right. Since our incorporation we have committed to always improving upon our past work, including the application of new technologies.
Pipe Fabrication Shop
• 15 Ton Bridge Crane (360' x 45' range)
• Indoor Loading Dock
• 3 Overhead Doors
• 8 Welding/Fabrication Bays
• MIG/TIG Welding
• Material Staging Area
Sheet Metal Fabrication Shop
• 10 Ton Bridge Crane
• DrawTech Software
• Plasma Cutters
• Loading Dock
• 2 Overhead Doors
Plumbing
• Back Flow Prevention Installation/Certification
• Medical Gas
• Natural Gas
• Sanitary Waste and Vent
• UG Storm & Sewer
• Domestic Water
• Laboratory Piping (Acid Waste, DI Water, RO)
• Compressed Air
Piping
• Chilled Water, Heating Hot Water Systems
• Steam Systems
• Process Piping
• Industrial Piping
• Refrigeration
• Sheet Metal Installation
• Project Budgeting
• Project Estimating
• Engineering
• Design/Build
• Project Management
